You might also like
in Sterling Heights, MI
Test Engineer - Full-time / Part-time
Hours | Full-time, Part-time |
---|---|
Location | Sterling Heights, MI Sterling Heights, Michigan |
About this job
SYSTEM JOB DESCRIPTION-Conduct Daily review quality indicators - REDCRS and Sterling Warranty Garage Reports for NE, APR, VO Repair, and FQAs issues
o Track concerns and review initial test results/data from all relevant test equipment.
o Once suspect unit is returned, record any retest of the transaxle or defect testing data-along with analysis-then assist garage in determining root cause, and document improvement actions to test equipment.
* Conduct a monthly review of all critical test point variable trend charts. Verify test point trends and current limits. Investigate or notify correct personnel of any unusual trends. Document charts in a binder for future reference.
* Maintain completed Defect Testing Matrix for all test equipment. The matrix should prioritize actions to address pass-thru items. For product changes, rerun defect testing for all affected components to verify containment.
* Assist Production and Quality departments in determining the root cause(s) of the top test stand rejects in the Regress areas.
o Lead reject resolution meetings in addressing test stand top FTT concerns.
o Provide Regress areas with a comprehensive suggested repair list.
* Assist Maintenance and Production in troubleshooting and repairing down test equipment. Investigate and implement corrective actions to address top availability issues. (I.E. faults and downtime)
* Maintain cycle times on test equipment ensuring stands are running at or below authorized cycle time.
* Support feasibility on product design changes and lead modifications and model code updates as required. Handle model additions, data base changes, test program and sequence changes; implement modifications of new parameters and limits.
* Assist technicians with calibration of test stand instrumentation per schedule.
* Maintain 'Challenge Part' for EFTs and IPTs.
o The DCP should require part testing daily on all stands.
o Monitor part test status and assist Production with reaction to a rejected test.
* Use test stand WMA software to monitor test stand FTT and stand to stand correlation.
* Devise and maintain a suggested repair and repair tree data base for the operators on the floor
* Daily provide Engineering Supervisor with Final and Main Control Test FTT reports and status of top rejects prior to production meeting
* FTT data should be reviewed at the start-up or close-out meeting with the teams daily