Urgently hiring Use left and right arrow keys to navigate
Provided by the employer
Verified Pay check_circle $60,000 per year
Hours Full-time
Location Howell, Michigan

About this job

Production & Materials Planner (JIT / Automotive Manufacturing)

Location: Facility-Based (Office & Manufacturing Environment)

Shift Options: 1st Shift & 3rd Shift

Position Type: Direct Hire / Full-Time & 610 Month Contract (3rd Shift)

Compensation: $60,000 / year (3rd Shift Contract Role)

Job Overview

We are seeking a detail-oriented, highly analytical Production & Materials Planner to join our team in a fast-paced Just-In-Time (JIT) automotive manufacturing environment. In this role, you will convert customer demand into efficient press, assembly, shipping, and raw material schedules while ensuring optimal inventory levels and 100% on-time delivery.

We are currently recruiting for two openings:

  1. Full-Time Production & Materials Planner

  2. 3rd Shift Materials & Logistics Specialist (610 Month Contract) Focuses on managing material flow, rack ordering, offloads, and scheduling/managing 2030 outbound/inbound trucks per week (approx. 5/day) between suppliers, stampers, and customers.

Key Responsibilities

Scheduling & Demand Planning

  • Ship Scheduling: Ensure accurate customer demand data in the ERP system. Plan and arrange truckloads to guarantee JIT customer delivery and meet target inventory levels.

  • Press & Assembly Scheduling: Convert customer demand into daily press and assembly schedules. Distribute schedules across teams and monitor production to prevent downtime or supply shortfalls.

  • Raw Material Scheduling: Translate customer demand into raw material requirements and issue releases to suppliers to support production schedules.

  • Logistics & Material Flow (3rd Shift Focus): Manage material offloads, schedule rack deliveries, and coordinate truck movement back and forth between raw material suppliers, stampers, and the plant. Oversee 2030 trucks per week (approx. 5 per day).

Operations & Project Management

  • Data & Systems Management: Maintain all computer-based planning files, databases, and ERP/MRP parameters.

  • ECN Coordination: Facilitate Engineering Change Notice (ECN) implementation and timing across departments.

  • Launch & Special Projects: Represent the materials/planning department on new vehicle launches and special project teams.

  • Capacity Management: Review, develop, and manage production capacity planning and present reports, analysis, and illustrations to management as needed.

Qualifications & Requirements

Required Experience & Skills

  • Automotive Manufacturing Experience: Direct experience working within an automotive manufacturing facility handling JIT requirements and direct customer communication.

  • ERP/MRP Proficiency: Hands-on experience using ERP/MRP systems for production, planning, or materials management.

  • Excel Proficiency: Advanced capability in Microsoft Excel for schedule tracking, data analysis, and reporting.

  • Customer Interface: Experience communicating directly with automotive OEM/Tier 1 customers regarding demand and shipping schedules.

  • Communication & Negotiation: Strong written and verbal communication skills with demonstrated negotiation capabilities.

Education & Experience Work History

  • Associate Degree (A.S.) or equivalent technical training.

  • Experience Options:

    • 2+ years of experience in Planning; OR

    • 3+ years of experience in a Materials department with ERP/MRP systems; OR

    • 5+ years of production/materials experience using ERP/MRP systems.

Preferred Training / Certifications

  • Ford Training / Ford System experience preferred.

  • ERP/MRP System certification or specialized training.

Physical Requirements & Working Conditions
  • Ability to work in both an office and an active manufacturing plant environment.

  • Frequent lifting up to 25 lbs.; occasional lifting up to 50 lbs.

  • Occasional reaching, bending, stooping, twisting, pulling, gripping, and climbing throughout the workday.

  • Ability to sit, stand, and walk for extended periods (8+ hours).

  • Good hand-eye coordination and standard digital literacy (computer keyboard, phone use).

Apply now!

#troy

PandoLogic. Keywords: Materials Planner, Location: Howell, MI - 48843 , PL: 604754293

Nearby locations

Posting ID: 1310047349 Posted: 2026-10-30 Job Title: Production Material Planner